The new safe water supply methodology will come into effect on 02 August 2021. This rule update provides guidance on the timelines and requirements for project developers currently applying Annex 3 of the TPDDTEC methodology, including information on registry submission, and changes + flexibilities provided for the issuance of Gold Standard Verified Emission Reductions (GSVERs). ...

The Gold Standard has put in place interim Covid-19 measures to provide as much flexibility as possible to enable the ongoing success of Gold Standard projects. Interim measures have been extended from 30/06/2022 to 31/12/2022 for only those projects which are located at a place where COVID-19 related restrictions still exist. ...

Applied to the Gold Standard Principles and Requirements, this rule update provides information on the scope, applicability and entry into force for the SDG Impact Tools. ...

Gold Standard version 2.0 instituted minimum site visit frequency requirements for Validation/Verification Bodies (VVBs) as part of the project verification process, subject to reasonable exceptions. This rule update provides requirements and guidelines for VVBs to address the instances when the project/VPAs are in non-compliance with the minimum site visit requirements. ...