Document name | Version | Released date |
---|---|---|
Digital SDG Impact Tool | 1.0 | 31.10.2023 |
Document name | Released date |
---|---|
The SDG Impact tool | 14.03.2022 |
Gold Standard is changing its certification processes with comprehensive updates, effective December 5, 2024. These changes aim to enhance efficiency, transparency, and robustness, reinforcing Gold Standard's commitment to excellence in climate action and sustainable development
This Rule Update is applicable to the methodology for Carbon Sequestration through Accelerated Carbonation of Concrete Aggregate (V1.0).
This Rule Update expands the scope of the Methodology for Biomass Fermentation with Carbon Capture and Geologic Storage V1.0 beyond fermentation so that it may cover emissions from additional industrial processes (e.g., anaerobic digestion, combustion, gasification and pyrolysis), thus making it applicable to additional project activities such as Bioenergy Carbon Capture and Storage (BECCS). The Gold Standard welcomes all feedback. In particular, we welcome feedback on any additional industrial processes that should be included, and any further provisions that should be highlighted at high-level in this document.
The rule update outlines: • Revisions to Paragraph 2.1.7 in the Renewable Energy Activity Requirements (V1.4), which pertain to the pre-approved exception for eligibility of grid-connected renewable energy projects with distributed installations. • Eligibility criteria for grid-connected projects that feature a Battery Energy Storage System (BESS).