Document name | Version | Released date |
---|---|---|
Principles & Requirements | 1.2 | 23.10.2019 |
Document name | Version | Released date |
---|---|---|
Preliminary Review Request Form | 2.0 | 16.08.2022 |
Document name | Released date |
---|---|
The SDG Impact tool | 14.03.2022 |
The new safe water supply methodology will come into effect on 02 August 2021. This rule update provides guidance on the timelines and requirements for project developers currently applying Annex 3 of the TPDDTEC methodology, including information on registry submission, and changes + flexibilities provided for the issuance of Gold Standard Verified Emission Reductions (GSVERs).
The Gold Standard has put in place interim Covid-19 measures to provide as much flexibility as possible to enable the ongoing success of Gold Standard projects. Interim measures have been extended from 30/06/2022 to 31/12/2022 for only those projects which are located at a place where COVID-19 related restrictions still exist.