Document name | Version | Released date |
---|---|---|
Microscale Project Requirements | 1.2 | 23.10.2019 |
Programme of Activity Requirements | 2.1 | 5.10.2023 |
The rule update outlines: • Revisions to Paragraph 2.1.7 in the Renewable Energy Activity Requirements (V1.4), which pertain to the pre-approved exception for eligibility of grid-connected renewable energy projects with distributed installations. • Eligibility criteria for grid-connected projects that feature a Battery Energy Storage System (BESS).
Following the publication of the Procedure for Development, Revision, and Certification of Methodologies and Methodological Tools v.2.0, the Gold Standard has conducted a review of status of approved methodologies.
With this rule update, the scope of the fast-track preliminary review is extended to include most project types, the document requirements have been reduced and the timelines for review expedited. The revised requirements and procedures are summarised in this rule update document.