Joined up sustainable transition (JUST): Coal Decommissioning

05.03.2024 In Development
ID
NMC 63
TYPE
Methodology
SECTOR
Renewable energy
DEVELOPER
Gold Standard
TOPICS
Fossil fuel phase-out
START DATE
22/02/2023
STATUS
Methodology consultation
NEXT STEP
Finalising methodology

A methodology to cover the early phase-out of coal fired power plants and their subsequent replacement with renewable energy projects (such as wind power or solar power) based on a 1:1 MW replacement. The methodology must be used in line with the Just Transition Requirements.

Both the methodology and the Just Transition requirements were out for an initial public consultation from 19 Nov 2025 – 19 Dec 2025.

RELATED DOCUMENTS

Document name Version Released date
Renewable Energy Activity Requirements 1.4 16.08.2021